Chariton Valley Planning & Development

nyc building code alteration type 3

Alteration project applications, upon its successful completion and final inspection, will always result in the issuance of a new Certificate of Occupancy (CO). To make matters worse, we took our application to the chief examiner who verbally told my expeditor that he has approved it but has not put anything into the dob system and told us he will get to it when he will get to it. As a Carpenter supervisor working for a Pubic University in NYC would I be liable for the demolition and building that I do without NYC Department of Buildings approval? Parking requirement waiver. Thanks! Code Revision. There is one more factor to be considered. Why are we paying to get this project inspected so many times when we will be getting a DOB inspection as well? The current door to/from that terrace will be reused and pushed back to the end of the new bedroom. These are typically associated with specific professionals (MEP Engineers, Structural Engineer, etc) It sounds like the costs go up depending on the number of professionals associated with the inspections. There are four types of construction permit applications: New Building (NB) and Alterations (ALT) Type 1, 2 and 3. Chimneys shall be subject to a special inspection in accordance with BC 1704.26, Special Inspections for penetration of fire-resistant elements and assemblies; and related firestops in accordance with BC 1704.27.1 and BC 1704.27.2. Building heights and areas in compliance with Table 503 (1968 BC Table 4-1 and 4-2 or 1938 BC Article 5, as applicable) are dependent on construction classification, occupancy and other fire prevention measures, e.g. Approval of an amendment must be obtained before the work is completed. This post does not assume to cover every possible issue or condition, but provide a general overview of the topic. You can report illegal/unsafe construction work and improper building use by calling 311 or visiting 311ONLINE: Phone Call 311. Richard M. Neuman ALT-1s and ALT 2s must be filed by a registered architect or licensed engineer; some ALT3s don't require detailed plans and can be filed by a non-professional. They consist of ZR regulations for the zoning lots size, its required yards, open space, lot coverage, building height (envelope compliance) and setbacks, and sometimes density, which is the permitted number of dwelling units on a zoning lot. City of New York. Any substantive changes require a PAA; however these changes must be shown on plans and included in the As-built submission at the end of the project (AC 28-104.3). As I am not an Expeditor or Code Compliance Officer, I cannot provide advice or direction. HlWI,)?CK@ `eu?C)?~?y1J;G:ukG)lH)sp?s~jO?oy.\qe+SbY>\~smUNU!^Y21v->[|~L}Qo}>e}yA,g%bO;|sl2  /EOh@LhOJsx_ye+-_i$3>R y;&9't?UOHF_a+'E|%ZpHqenU_-!ys&*X-a%^(!R{ q/o>`HI e1E 2023 All Rights Reserved, NYC is a trademark and service mark of the City of New York, Project Guidelines for Design Professionals, https://www1.nyc.gov/assets/buildings/pdf/plan_exam_user_guide.pdf, 2016 NYCECC Tables C403.2.3(1) through C403.2.3(7)and Table C404.2, Title Sheet, Site Plan, Drawing Index, General Notes, required special/ progress inspections list, and Legends, Proposed Reflected Ceiling Plans (if applicable), Proposed Enlarged Floor Plans (if applicable), Proposed Interior Elevations and Details (if applicable), Structural Plans and Details (if applicable), Plumbing Riser Diagram Gas Riser Diagram - Piping, Plumbing Fixture Schedules Plumbing Details, Mechanical System Equipment and Schedules, Reflected Ceiling Plan for Mechanical System (if applicable), All habitable apartments created through LL 49 of 2019 shall have a minimum clear ceiling height in all habitable rooms of 7 feet and 6 inches with projections as allowed by exception 1 of section. Thank you for your question. Ive heard of similar things being done in other states, but I am unsure as to the legality of this practice. What jurisdiction is the building located in? Alterations of 1 or 2 family residential buildings shall also comply with the Housing Maintenance Code (HMC). Any new construction in NYC will require an NB permit. If the new building is filed as a NB, what about the demo part? 2014 AC 28-101.4.3 -Optional Use of 1968 Code via 28-101.4.5, AC 27-114, 2014 AC 28-101.4.3, AC 28-101.4.5, and 1968 AC 27-114, 2014 BC Chapter 11, and Appendices E, N and P as applicable, BC 1101.3, AC 27-293 through AC 27-306; Tables 4-1 and 4-2. I feel as though I am in the 3rd world country and there is no control over this situation. Furnace and boiler equipment with 400,000 British thermal units (Btu) (4.22 108 J) per hour input rating or less is not required to be enclosed. Hi, Ive got a commercial space in manhattan that Im going to build out, my architect is going to do it Directive 14 and self-certify. One of those outcomes is a formal DOB-ECB violation. Alterations to Existing Buildings erected PRIOR to 1968 shall comply with 2014 NYC Construction Codes AND application provisions of 1968 Building Code AND 1938 Building Code. "+(GgAHQtCB%P4n^=MV@]BpLxEvO1K84[h!Q1ekkW' "CFQ uiyr]UwB(g8!OH7=Gs^:#bp.8#*q`$#-,t2N.S] {ViFQF1+W2`}B0O{,2D%vKvhL_02l}0s^q#.=aJ`[ 7q_M'j4X (6|L]ph:\Y"7oH GdgcIL"\LTc0B ')w-2@_B|xr5vK.+m]%vVw`|UX{N ? The expeditor is going to: Prior to DOB permit issuance, the owner must typically engage a registered Special Inspection Agency (SIA) who will take responsibility for the Special and Progress Inspections. (E) Designations An (E) designation provides notice of the presence of an environmental requirement pertaining to potential hazardous materials contamination, high ambient noise levels or air emission concerns on a particular tax lot. Mechanical systems requiring a certificate of compliance in accordance with AC 28-116.4.1 shall be inspected for conformance with the approved construction documents as per BC 1704.16. Dampers integral to building envelope: outdoor air dampers must close when system is off. is directive 14 still in place. One other thing to consider, is I noticed Andy referenced TCO, and not CofO. This legislation was necessitated by the fact that the volume of construction grew far in excess of the number of available Inspectors. A complete submission of drawings should include: All construction documents must be noted as an Alteration per LL 49/2019.Construction drawings that do not indicate clearly participation in this demonstration program will not be reviewed or approved using provisions from LL 49/2019. Is there anyone I can complain to? Soil Excavation If the scope of work includes excavation in order to increase the apartment ceiling height or expansion of existing building footprint to accommodate window wells, such work shall be approved by Department of Environment Protection. Facility Location. Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City. How To Start An Event Business From Home. Date Posted: 8/5/2022 . Ill pose the question to my colleagues as well. If it were, I presume the backup of DOB inspectors and inspections that Directive 14 alleviates would be unmanageable at best. Most commonly, an Alteration Type-I Application will be used to change the Maximum Number of Persons for a space, to change the Occupancy or Use Group of a space, and/or to change the Description of a space. What is the difference between a Union Shop and Open Shop inConstruction? In order to achieve these purposes, a direct control of density as well as of the physical volume of buildings is established. You may also want to get a competitive rates and compare costs to your architects expeditor. If youre modifying structural details of the residence and a structural stability inspection has to be performed now youre bringing in a separate professional to the project and likely seeing a 2-3k bump in costs. If you would have continued to overseen that project, and anyone decided to call a complaint, or someone requested the contractors permits, or even (God forbid) someone got hurt..YOU would be liable, because you knowingly continued to let them work without proper documentation. Basically this is interior or exterior renovations that leave how the building is used them same. Can I file it to make it legal instead of reverting back to original deck? If you are planning to file an NYC DOB Alteration Type 2 or Type 1 we would be happy to discuss your project. in the Bronx. The building has more than enough left over in the FAR to do this. The Buildings Department offers a Professional Certification Program which enables Registered Architects (RA) and Professional Engineers (PE) to certify that the plans they are filing with the Department are in compliance with applicable laws. According to Census 2011 information the location code or village code of Nanthan Chedu Extension R F village is 634141. When submitting the construction documents to DOB, the Registered Design Professional, who is the Applicant of Record, is responsible for submission of complete set at filing: application, drawings, and coordination of required documents as summarized below. Most fit-outs use an ALT2permit application, which must be filed by a PE or RA. Post Approval Amendments. Increasing paved, or similarly impermeable areas include waterproofing details as applicable to new unit, Adding or removing any accessory parking spaces, Egress Modifications Any change in the exiting width, length of travel distance, or exit way/exit door location(s), or occupancy load of exits, or any change in number of required exits in a building, Expand scope to add building systems, including any new equipment, Any addition or removal of plumbing, gas or mechanical risers, Any reduction below the minimum number of code required fixtures, Changes to approved plumbing and/or gas fixtures and equipment (See Plumbing Guidelines for more information), Changes to scope of work that require additional Special or Progress Inspection(s). Self-certification though typically paired with Directive 14 are not required to be filed together. For example, accessibility, work on mechanical, plumbing, sprinkler, fire protection and/or fuel gas systems, specific building elements such as security grilles, handrails, guards, roofs, etc., and certain kinds of structural work are required to comply with current code provisions. A ADCIRC (ADVANCED CIRCULATION) MODEL A computer model used for modeling coastal storm surge which results in the generation of stillwater elevations associated with storm events. Recent Activity. in the midst of them is this Building Code Quick Reference Guide A Schematic Building that can be your partner. 10/16/14 Update: Thank you to my readers for making this the most popular article on the blog. Im renovating my office, does the existing bathroom need to be ADA Compliant? Bulk Regulations Bulk regulations are adopted in order to protect residential areas against congestion and to encourage the development of desirable and stable residential neighborhoods. DOB divides construction alteration into three types. Drawings indicating excavation, underpinning and/or shoring shall be provided in accordance with BC Section 1814. Applications to create or alter a basement or cellar apartment per LL 49/2019 must be submitted as Alteration Type 1. *A fee of 1% + $1 applies to cashing payroll checks, recurring government benefits, and PLS money orders up to $1,000. One example would be converting a store to a restaurant in a building with no Certificate of Occupancy. ADVISORY BASE (1% ANNUAL CHANCE) FLOOD ELEVATION [ABFE] The online submission of project application shall occur by completing the intake form with key project information. The basic difference between an Alteration Type 1 and an Alteration Type 2 is the effect on the Certificate Of Occupancy for the building. The Department has engaged the services of the International Code Council to . A soils investigation is relevant for foundations and must be completed and submitted by a Professional Engineer. Vice President of Finance & Operations at Mack Weldon. There was already a PA. Current construction codes and prior codes are available at the following: Per AC 28-101.4.3, prior codes may be used at the option of the owner with certain exceptions that the 2014 Code must be used. Also refer to Sprinkler Project Guideline. Alt 3 - Alteration Type 3 Demo - Demolition Permit NB New Building Permit Filing a new building application with DOB is filed as an NB. DOB Tenant Property or Business Owner Industry Safety Codes Code Development NYC Codes Code Notes Reference 2022 Construction Codes Table of Contents GENERAL ADMINISTRATIVE PROVISIONS PLUMBING CODE MECHANICAL CODE FUEL GAS CODE BUILDING CODE Required Documents. NOTE: The following is a list of key zoning, Code and other regulations that may be relevant in the project design, it is not comprehensive. The Knoll at Stone View Apartments is located in Ruckersville, Virginia in the 22968 zip code. On November 7, 2021, a local law to bring the New York City Mechanical, Fuel Gas, and Building Code up to date with 2015 editions of the International Code Council's I-Codes was enacted as Local Law 126 of 2021.The 2022 NYC Construction Codes go into effect on November 7, 2022.. REFERENCE NOTE: Organizations like the AIA, CSI and National Institute of Building Sciences work jointly to create national standards for consistent documentation and data organization, to assist in communication and coordination across the design and construction industry. Steam boiler equipment operating at pressures of 15 pounds per square inch gauge (psig) (103.4 kPa) or less is not required to be enclosed. An Alteration Type-2 Application may be used when there is no change to the Certificate . what work cant be done by an owner builder in NYC. Please let me know. General Construction (GC) formerly Alteration Type 2 & 3 -The most common type of application, this is for the renovation of an existing space with no change to the use, occupancy, or egress. Per FC 501.4.2, lawfully existing fire department access roads on and before June 31, 2008, may remain. Alteration Type 3 (Alt-3). The following list, while not all inclusive, are examples of some of the substantive changes that must be submitted for review to amend the approved plans: As-Built Submission. Temporary Tents and Other Structures COMING SOON! Buildings built before 1938 are not required to have a Certificate Of Occupancy unless they undergo an alteration requiring a new Certificate Of Occupancy. Hot water boilers operating at pressures of 170 psig (1171 kPa) or less are not required to be enclosed. channel 2 news buffalo new york Portable Cattle Fence Panels Round OD 38MM 1.8X2.2 Meter For Livestock Farm SS Heat Ex. If a building does not have a Certificate Of Occupancy or the Change is in the same use and occupancy group you can apply for a letter of no objection (LNO) to make a change in use. Also see BC 1905.6 and BC 1905.3, and BC 110.3 and BC 1913.10. I wanted to know your thoughts on whether my construction project should be done as an Alt1 or Alt 2. I have a question. A Group F-1 occupancy used for the manufacture of upholstered furniture or mattresses exceeds 2,500 square feet (232 m 2 ). Additionally, these projects typically have higher levels of risk during various stages of construction, which require special inspection certifications, progress inspections and final Department of Buildings inspections required for the issuance of certificates of occupancy. The following changes require an Alt 1 and a new C of O: Change in use, egress, or occupancy. NB stands for New Building. Alteration Type-IIIis a minor alteration that involves only one type of work, such as a curb cut or a construction fence. Alarm-initiating and notification appliances shall not be required to be installed in tenant spaces outside of the. The site is updated and maintained online as the single authoritative source of soil survey information. We recently filed ALT Type II filing and listed a special inspection agency and representative for the TR1: Technical Report for the architectural and structural inspections. Construction Permit Applications for Renovations. Department of Buildings work permits are required for most construction projects. Its best to assume that any construction requires a building permit. Soil surveys can be used for general farm, local, and wider area planning. v\X9\rPs~ iF ba>c0@ V7 The DOB now includes random audits of Directive 14, or Alt 2 projects with active permits. A reduction to an existing buildings floor area that impacts the Certificate of Occupancy -For example, the complete elimination of one or more stories from a building or the demolition of a space. I would like to put up a privacy fence along my front porch about 6-8 high. The following registers are monitored and logged -ACC -r0 to r7 -PSW (CF, Suits: Plug 'n' Play replacement of the factory ECU for Honda OBD-I B-Series 92-95 Civic . See Mechanical project guideline. NYC Building Permits What does NB, Alteration Type I, II, III and Directive 14 Mean? A Group F-1 occupancy used for the manufacture of upholstered furniture or mattresses exceeds 2,500 square feet (232 m, A Group S-1 occupancy used for the storage of upholstered furniture or mattresses exceeds 2,500 square feet (232 m. The building site has sufficient municipal water supply for design and installation of an automatic sprinkler system. This article was written with input from code professionals. Unleashing the Power of Architectural and Engineering Design Teams: How They Supercharge Your Project! Hi. Our timber frame kits contain home plans that start at either 24' or 28' deep and then work in 4' increments, ie 2436, 40, 44, etc. NEWBURGH. The Certificate Of Occupancy is a document that lists the buildings legal use or occupancy. Is it possible the special inspections are actually the special enforcement unit of the DOB? 58 0 obj <>/Filter/FlateDecode/ID[<6C35DDC53B7B6FBB18620E6D8A066CF0>]/Index[30 53]/Info 29 0 R/Length 131/Prev 231756/Root 31 0 R/Size 83/Type/XRef/W[1 3 1]>>stream Where approved by the building official, buildings where an automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 of the Building Code of New York State has been added, and the building is now sprinklered throughout, the required fire-resistance ratings of building elements and materials shall be permitted to meet Position Type: Certified - Middle School. New Buildings COMING SOON! Alteration of existing structural systems or elements, such as columns, girders, beams, bearing walls, etc. hb```f``Ja`e`(`b@ !( g03A$cWVi:dy*r]Si/_Y:@H0JX`$ BBu0Jbdfx +[g Max 50 Feedlot 10-Line Galvanized Cattle Fence Panel at Tractor Supply Co. Buy OK Brand 10 Line Cattle Panel 16 ft. L x 50 in. ***NOTE: Per BC 1103.2.4, Detached one and two-family dwellings, their accessory structures, and their associated sites and facilities are not required to be accessible; however, if accessibility is voluntarily provided, it must comply with the Code. FDNY Notification, per FC 901.7.5, if doing construction work that impacts fire protection. I want to replace the old flooring in the space, do I need a permit for this, and if so where do I go? Alteration work must comply with the current NYC Energy Conservation Code (2016), NYC Electrical Code (2011), NYC Fire Code and other applicable local laws. Enter your email address to subscribe to this blog and receive notifications of new posts by email. Concrete mix designs shall be in accordance with BC 1905.3 and 1913.5 (former TR 3 form). Apartments in cellars. An Alteration project could be filed for review under either the current Codes, the 2014 NYC Construction Codes, Administrative (AC), Building Code (BC), Plumbing (PC), Fuel Gas (FGC), and Mechanical Codes (MC), or under Prior Codes, such as the 1968 Code, 1938 Code or earlier Codes, depending on the age of the existing building; reference AC 646.481.1861 or email info@builtengineers.com. 217 LIBERTY ST. NEWBURGH, NY 12550-9998. The site may have a special use permit or use variance from the BSA. DOB divides construction alteration into three types. 904.1.3Upholstered furniture or mattresses. Thank you. Alteration Type 2 (Alt-2). Directive 14 is specifically related to architects who are self certifying. Are subject to Special Inspections in accordance with BC 1704.9. Hi Eric. So if those changes included egress doors being moved, or occupancy classes for spaces, or occupancy calculations in general being modified, then indeed an Alt 1, and therefore updated CofO, would have been required. Make sure to consult with your architect about what type of alteration is right for your project. Do I need any permits in order to do this? If thats the case, any application for the subject property that changes the floor plan, elevations, or site plan previously approved by the BSA, should again be approved by the BSA prior to DOB Permits being issued. The costs sound reasonable, but my familiarity is with commercial and not residential. Aside from following the NYC building codes, you will also need to follow your building rules. Such alterations may be filed for review under the current construction codes or prior codes, as permitted by AC 28-101.4.3. [NY] AJ104.1 Additions, alterations, or renovations. https://OwnersRepNY.com/2023/03/01/what-is-the-difference-between-a-union-shop-and-open-shop-in-construction/, Unleashing the Power of Architectural and Engineering Design Teams: How They Supercharge YourProject! Some minor alterations may be done without a work permit. Cellar Apartment Egress Cellar apartments shall be provided with two means of egress directly to the outdoors, including access to a public way. Coastal Construction Manual - 1986 Blueprint Reading - Sam Kubba 2008-10-21 Improve Your Ability to Read and Interpret All Types of Construction Drawings Blueprint Reading is a tractorsupply.com 16 ft. x 50 in. Our partnership with Piero began with his 2018 KN Collection and has since expanded to include sofas, tables & lounge. I have a question, I have a deck that I bought with the house that on the final survey samped approved by NYC DOB. Footing and foundation progress inspections shall be made after excavations for footings are complete and any required reinforcing steel and required forms are in place as per BC 110.3.1. SALARY: $16.65.Interviews at US Postal . I have a commercial building in Brooklyn that I have owned for over 20 years. If you are building a New Building you will File an NB Application. It is always recommended to consult with an Expeditor before undertaking any work in case theres something you may have overlooked in your project that might trigger a compliance issue. City of New York. Is the work divided into 2 separate applications? I am regularly asked by readers to provide input on specific code issues for their projects. We are going to gut renovate a 2 family in Queens and my architect sent us the quote for an expeditor and another additional one by a special inspection company (linked to the expeditors because they use the same address. Any changes to approved scope of work that are significant and substantive will require submission of revised documents and/or plans as a post-approval amendment (PAA). Fire-resistance-rated partitions, floors, ceilings, shafts, and shutters as per BC 110.3.4. When an Alteration Type-II is filed under Directive-14 (such is the case 99% of the time), the Applicant or other NYS Registered Professional Engineer or Registered Architect may signoff the application with a Directive-14 Final Inspection. where the stability or integrity of a structural system is to be temporarily diminished, in accordance with BC 1704.20.6 through BC 1704.20.10. (Visit http://www.nationalcadstandard.org for more information.). Quality Housing Regulations Quality Housing Program, as promulgated by sections ZR 23-15, and ZR 34-11, is mandatory in contextual zones with A, B or X suffices and optional (with exceptions) in other R6-R10 zones and it introduces additional requirements to the provisions for use and bulk ZR 28-00. Emergency Escape and Rescue Openings All sleeping rooms in basement or cellar apartment shall have emergency escape and rescue openings. *, LICENSING AND REGISTRATION OF BUSINESSES, TRADES AND OCCUPATIONS ENGAGED IN BUILDING WORK, BOILERS, WATER HEATERS AND PRESSURE VESSELS, SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY, GENERAL BUILDING HEIGHTS AND AREAS; SEPARATION OF OCCUPANCIES, GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER, ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY, SAFEGUARDS DURING CONSTRUCTION OR DEMOLITION, MODIFIED INDUSTRY STANDARDS FOR ELEVATORS AND CONVEYING SYSTEMS, SUPPLEMENTARY REQUIREMENTS FOR ONE- AND TWO-FAMILY DWELLINGS, ASSISTIVE LISTENING SYSTEMS PERFORMANCE STANDARDS, MODIFIED NATIONAL STANDARDS FOR AUTOMATIC SPRINKLER, STANDPIPE, FIRE PUMP, FIRE ALARM, AND SMOKE CONTROL SYSTEMS, ACOUSTICAL TILE AND LAY-IN PANEL CEILING SUSPENSION SYSTEMS, SUPPLEMENTARY FIGURES FOR LUMINOUS EGRESS PATH MARKINGS. What is the dierence between an Alteration TypeI (Alt1), Alteration TypeII (Alt2) and an Alteration TypeIII (Alt3) Application? One caveat is if the building is a landmark or in a designated historic district, you may need approval from the NYC Landmarks Preservation Commission (LPC) before undertaking most repair work. That means if the building is 10,000 Square feet and you wish to add 11,000 square feet or more it must be filed as an Alteration Type 1 to meet new building regulations. A conversion also includes any alteration within the residential portion of an existing building that increases the number of rooming units or dwelling units in a building. VP Finance, Operations. If yourwant to build an addition to your building that changes its use or occupancy. There may be additional, applicable Zoning Resolution, Construction Code, Multiple Dwelling Law or Energy Code . Examples: Converting a commercial building or space to residential Vertical enlargements (adding floors) The installation of post-installed mechanical anchors, adhesive anchors, and screw anchors shall comply with Table BC 1704.32. 2. Use Regulations All two family home types are UG 2, per ZR 22-11. Applicable forms and all construction documents must be noted as an Alteration per LL 49/2019.Applications that do not indicate clearly participation in this demonstration program will not be reviewed or approved using provisions from LL 49/2019. There are different types of fillings with the NYC Department Of Buildings to acquire NYC Building Permits. An Alteration project could be filed for review under either the current Codes, the 2014 NYC Construction Codes, Administrative (AC), Building Code (BC), Plumbing (PC), Fuel Gas (FGC), and Mechanical Codes (MC), or under Prior Codes, such as the 1968 Code, 1938 Code or earlier Codes, depending on the age of the existing building; reference AC Value Engineering (VE) Are you designing in value or just cutting costs? Alt 1 or Alt 2 There are different types of fillings with the NYC Department Of Buildings to acquire NYC Building Permits. Repairs and painting do not usually require permits, but renovations, additions and demolition always do. For example, youll need an ALT2 when adding a new bathroom,rerouting gas pipes and adding electrical outlets; or moving a load-bearing wall. Hi James, Im not aware of Directive 14 of 1975 being revoked. and so on. If you are interested in discussing a specific project please contact us directly. For example, the function of a portion of a living room is changed to a bedroom or what was previously a mechanical space is now a bedroom. ALT-1sand ALT 2s must be filed by a registered architect or licensed engineer; some ALT3s dont require detailed plans and can be filed by a non-professional. The Disneyland Railroad (DRR), formerly known as the Santa Fe & Disneyland Railroad, is a 3-foot (914 mm) narrow-gauge heritage railroad and attraction in the Disneyland theme park of the Disneyland Resort in Anaheim, California, in the United States.Its route is 1.2 miles (1.9 km) long and encircles the majority of the park, with train stations in four different park areas.

Bachelorette Spa Packages Dc, Katy Rickitt Calendar, Michael Fuchs Car Collection, Cyclical Theory Of Empires, Articles N